Projects

NREL Labs and Gas Storage/Distribution

This project consisted of the remodel and build-out of a new research reactor lab including all building services and research gases with lab casework, fume hoods and enclosed reactor pods. In addition, it also included constructing a new gas storage pad and canopy with underground gas distribution into the research building and distribution to the labs. It also included the reconfiguration of the smaller existing building gas storage. This was a largely operational and fully occupied research facility with complex systems that required an increase awareness of research needs and safety, as a top priority.

Editas Medicine Process Development Lab

Build-out of 2,500 SF Process Development lab for a pharmaceutical developer. The project consisted of all new mechanical/HVAC systems to support a new lab including a new exhaust system for fume hoods, new makeup air handler, and rework of existing supply and return ductwork. The electrical scope included new service entrance to the building with a larger transformer from Xcel, new main distribution gear, and all new branch circuitry to support the new lab and benches. The room was equipped with large fume hoods, custom benches, articulating exhaust booms and flammable liquid lockers.

https://sunconstruction.com/older-single-woman/


This was a fast-track, design-build project that consisted of the renovation of 3 areas (3,800+ sf) into computer server and electronic workspace laboratories in an occupied building. The primary work was extensive HVAC and electrical revisions with supporting architectural work. This project consisted of maintaining correct negative air pressures to surrounding spaces that included humidification control. The work also included new power distribution system including Starline busway and exterior site work to support the interior mechanical requirements. An exterior ground mounted RTU system comprising of five parallel 25-ton HVAC units was constructed on grade with underground supply and distribution ductwork serving the building.

japanese dating app in america

best dating sites in united kingdom

A multifaceted, multi-phased project including Civil with improved site drainage & paving, a new salt storage pad, and added fire hydrants.  In addition, 3 Phases of new electrical service work including Phase 1 substation, Alternate 1B, rated at Power Transformer T1 115-3.2kV with new secondary feeder lines to feed electrical service for the entire 325 acre including new Phase 2 feeders to the new substation.  Alternate 1C substation with same specifications as Alternate 1B. Phase 3 115kV Transmission lines with 11 new 90’ high transmission poles plus 3 more poles at the Xcel feeder side.

the date of easter

County Line Liquor

New construction of a 7,593 SF steel framed liquor store.

University of Colorado

The project consists of approximately 12,000 gross square foot interior renovation of the existing student social center at the 1st level, including the bowling lanes, club and recreation space. New elements incorporated into the work; Billiards/Lounge, Club Area and Stage Platform, Check-in Area, Bar including beer and soda taps, and walk in cooler, Renovation of Bowling lanes including custom fabricated bench seating, booths, and racking.

HPE Servery Renovation

Renovation of existing Café Servery including new salad bar, international grill, pizza oven and self-serve coolers.

City of Longmont Operation & Maintenance Facility

The project consists of a 20,160 SF, 8 bay pre-engineered metal building with car/truck wash bay, compressed air services, radiant heat, carbon dioxide detection system and 5-acre site development. Free standing fueling service center consisting of a fuel island with canopy, dispensing equipment, an 8000-gallon gas storage tank and a 20,000-gallon diesel storage tank.

Aspen Ridge Preparatory School – Erie, Colorado

New 26,000 square foot two story school and two-acre site development. Building amenities were decorative wood entry canopies, elevator, warming kitchen, operable partitions, art, music and science rooms.

Ozo Coffee Longmont

This project consisted of a 2,300 SF two level tenant finish space from a core shell condition. This space contains very unique, custom finishes completed by our cabinet shop. Some of those intriguing features that were integrated in the space were custom fabricated millwork which included: CNC routed art/burlap panels, wood inlay ceiling panels, curved display walls and shelving, seating bar tops and benches, live edge wood bar and serving tops, custom fabricated reclaimed wood stairs, treads and landings, and even custom made wooden light chandeliers. Other features of the coffee shop included a beautiful curved mezzanine level overlooking the shop and providing a great view of the Front Range which enhances the overall visitation experience. The order and serving counter included integral chilled display coolers, point of sale/transaction area and receiving section.

County Line Liquor

New construction of a 7,593 SF steel framed liquor store.

University of Colorado

The project consists of approximately 12,000 gross square foot interior renovation of the existing student social center at the 1st level, including the bowling lanes, club and recreation space. New elements incorporated into the work; Billiards/Lounge, Club Area and Stage Platform, Check-in Area, Bar including beer and soda taps, and walk in cooler, Renovation of Bowling lanes including custom fabricated bench seating, booths, and racking.

HPE Servery Renovation

Renovation of existing Café Servery including new salad bar, international grill, pizza oven and self-serve coolers.

City of Longmont Operation & Maintenance Facility

The project consists of a 20,160 SF, 8 bay pre-engineered metal building with car/truck wash bay, compressed air services, radiant heat, carbon dioxide detection system and 5-acre site development. Free standing fueling service center consisting of a fuel island with canopy, dispensing equipment, an 8000-gallon gas storage tank and a 20,000-gallon diesel storage tank.

Aspen Ridge Preparatory School – Erie, Colorado

New 26,000 square foot two story school and two-acre site development. Building amenities were decorative wood entry canopies, elevator, warming kitchen, operable partitions, art, music and science rooms.